Clipsal C-Bus Manual de instrucciones Pagina 89

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 148
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 88
1250SM0904R10/09 C-Bus™ Basic Programming
10/2009 C-Bus™ Products Training Course
© 2009 Schneider Electric. All Rights Reserved. 83
Once a C-Bus project or network has been opened successfully you will see
that the:
project is given a description of “Open Networks”
network is given a description of “Running”.
Figure 59 – An open C-Bus project
Closing a C-Bus Project / Network
Closing a C-Bus project or network will disconnect the Toolkit software from
the PC Interface used by the running project.
Closing a C-Bus project or network is dependent on which node of the
Navigation tree is selected:
If the C-Bus Project node of the Navigation tree is selected, by pressing
the Close All Networks button on the toolbar, each C-Bus network in the
selected project will close.
If the C-Bus Network node of the Navigation tree is selected, by
pressing the Close Network button on the toolbar, the selected C-Bus
network will close.
Once a C-Bus project or network has been closed successfully you will see
that the network node in the Navigation tree is given a description of
“Closed”.
Figure 60 - A closed C-bus project
Vista de pagina 88
1 2 ... 84 85 86 87 88 89 90 91 92 93 94 ... 147 148

Comentarios a estos manuales

Sin comentarios